Renovation of public lighting, electrical supply an energy management in the city of Camarles

alumbrado sostenibles camarles

ENERTIKA supplies electricity in all the public lighting of the Camarles City Council (Tarragona) in line with its policy of energy improvement through energy efficiency.

Implementation of Energy Efficiency Solutions

The main characteristics of the project are:

  • Duration of 115 months (from April 2012 to November 2021)
  • Total project cost: € 781,910
  • Replacement of 1,028 light points
  • Renewal of 24 electrical panels
  • Total installed power of 780,088 W, with powers ranging from 250 to 50 W
  • Legalization of the facilities according to current regulations

Energy Management measures

  • Electricity supply to cover all electricity demand
  • Annual comparison of electrical traders
  • Real-time monitoring of all electrical panels
  • Preventive Maintenance
  • Corrective maintenance
  • Energy management through our W-City platform
    • The W-City cloud platform, in addition to being a central remote control lighting system at the panel and point-to-point level, is an open platform that uses standards to connect with different Internet of Things (IoT) devices and third-party systems
    • With IoT data entry and an analytics layer, it offers energy management and maintenance functionalities that facilitate decision-making and are essential for verifying savings in real time

The energy savings based on the initial electricity demand are 332,040 kWh / year. This is equivalent to 54.19% of the previous total consumption and implies a reduction of the environmental impact by 94.41 tons of CO2 per year.